Risk-Based Surveys in Idaho

Nursing homes that carry CMS's new High Performing icon, and the inspections CMS has recorded as risk-based surveys: shorter visits CMS says are “only given to higher performing facilities.”

Data: CMS September 2026 · PBJ Q1 2026CMS dataMethodologyCMS policy

Download

14 of 80 Idaho nursing homes (17.5%) carry CMS's High Performing icon in the September 2026 Provider Information release. None has a standard inspection CMS recorded as a risk-based survey (footnote 29). Historical inspection records can predate the September 8, 2026 nationwide rollout.

Nursing homes with CMS High Performing icon status, CMS star ratings and recorded risk-based surveys
CMS star ratings
Advanced Health Care of Coeur D'AleneCCN 135142Coeur D'Alene, ID★★★★★★★★★☆★★★★★5.49May 21, 2026none in CMS Inspection Dates
Ashton Memorial Living CenterCCN 135097Ashton, ID★★★★★★★★★★★★★★☆4.65Dec 10, 2025none in CMS Inspection Dates
Aspen Park of CascadiaCCN 135093Moscow, ID★★★★★★★★☆☆★★★★☆3.63Jul 23, 2026none in CMS Inspection Dates
Idaho State Veterans Home - LewistonCCN 135133Lewiston, ID★★★★★★★★★★★★★★☆4.72Jul 17, 2025none in CMS Inspection Dates
Idaho State Veterans Home - PocatelloCCN 135132Pocatello, ID★★★★★★★★★★★★★☆☆4.95Aug 7, 2025none in CMS Inspection Dates
Life Care Center of BoiseCCN 135038Boise, ID★★★★★★★★☆☆★★★★☆3.53Jul 17, 2025none in CMS Inspection Dates
Life Care Center of LewistonCCN 135128Lewiston, ID★★★★★★★★☆☆★★★★★3.43Aug 1, 2025none in CMS Inspection Dates
Life Care Center of Post FallsCCN 135135Post Falls, ID★★★★★★★★☆☆★★★★★4.18Aug 14, 2025none in CMS Inspection Dates
Mccall Rehabilitation and Care CenterCCN 135082Mccall, ID★★★★★★★★★☆★★★★☆3.23Jul 24, 2025none in CMS Inspection Dates
Oneida County Hospital & Long Term Care FacilityCCN 135062Malad, ID★★★★★★★★★★★★★★★5.85May 13, 2026none in CMS Inspection Dates
Owyhee Health & Rehabilitation CenterCCN 135087Homedale, ID★★★★★★★★★☆★★★★☆3.98Aug 21, 2025none in CMS Inspection Dates
Payette Healthcare of CascadiaCCN 135015Payette, ID★★★★★★★★★☆★★★★☆3.58Sep 12, 2025none in CMS Inspection Dates
Promontory Point RehabilitationCCN 135137Ammon, ID★★★★★★★★★★★★★★☆5.62May 28, 2026none in CMS Inspection Dates
St Luke's Elmore Long Term CareCCN 135006Mountain Home, ID★★★★★★★★★★★★★★☆6.99Jan 23, 2026none in CMS Inspection Dates

Star ratings are CMS's (1–5, September 2026 Provider Information): OVR overall, STF staffing, INS health inspection. “Not rated” means CMS published no rating; “fn” is a CMS rating footnote. Risk-based survey: the most recent standard inspection CMS marks with footnote 29. A dash means CMS Inspection Dates has none on record for the facility, not that no inspection took place.

1–14 of 14 facilities

Idaho in context

14High Performing icon
80Nursing homes
17.5%Share (11.6% nationally)
0RBS survey recorded

Methodology & sources

What the High Performing icon is

CMS added a High Performing Icon field (Y/N) to Provider Information in the September 2026 release. CMS's data dictionary describes it as marking homes that exceed the traditional five-star rating, with fewer citations, higher staffing levels and other quality indicators. CMS memo QSO-26-14-NH sets out the criteria for risk-based surveys. CMS's data dictionary does not say the icon is the same thing as eligibility for a risk-based survey, so this page shows the icon and recorded risk-based surveys side by side and does not treat one as proof of the other. The icon is reported exactly as CMS publishes it.

Star ratings and footnotes

Overall, Staffing and Health Inspection ratings are CMS's five-star ratings from the same Provider Information file. Where CMS gives no rating it publishes a footnote code instead, shown here as “fn”. In this release every facility with footnote 18 on its overall rating is a CMS Special Focus Facility, so the table labels those “Not rated: Special Focus Facility”. Other codes are shown as CMS publishes them; see CMS's Provider Information data dictionary for their definitions. In this release every staffing rating that carries footnote 23, 24 or 25 is a 1.

What "risk-based survey" means

CMS marks a standard health inspection with footnote 29 when it was a risk-based survey: “shorter visit with a smaller inspection team.” The column shows the most recent such survey in CMS Inspection Dates. 119 facilities have one on record; 46 of them do not carry the icon in this release. Eligibility and completed inspections are reported separately for that reason.

CMS-recorded risk-based survey dates run from Apr 11, 2024 to Jul 15, 2026; 108 are in 2026. These are historical inspection records, not a count of surveys conducted after nationwide rollout.

CMS revised QSO-26-14-NH (September 29, 2026) confirms that testing began in 2023 in 22 states and more than 100 facilities; nationwide implementation began September 8, 2026. The source fields do not identify pilot participation for individual inspections. PBJ320 preserves CMS footnote 29 and survey dates as published; it does not independently reclassify surveys or label all earlier records as pilot inspections.

What this page does not say

  • A missing icon is not a finding about care. CMS applies criteria that are not all public, and the icon can change month to month.
  • The icon is CMS's designation, not a PBJ320 prediction or rating.
  • A dash in the risk-based survey column means CMS Inspection Dates has no footnote-29 inspection for the facility. It is not evidence that no survey took place.
  • Star ratings and HPRD are context from different sources and periods, listed below.

Dates on this page

CMS processing dateSep 1, 2026The as-of date CMS assigns to the Provider Information file.
CMS last modifiedSep 30, 2026The last-modified date CMS records for the dataset on data.cms.gov.
CMS public releaseOct 8, 2026When CMS released the file publicly on data.cms.gov. CMS announced a delay for this release.
PBJ320 admittedOct 8, 2026When PBJ320 validated and adopted the file.
Survey datesPer facilityActual inspection dates from CMS. A recorded risk-based survey can predate the current icon.
PBJ staffing quarterQ1 2026Total nurse HPRD comes from PBJ payroll data for this quarter, a different period from the CMS ratings.

History

The September 2026 release is the first in which CMS published the High Performing icon and footnote 29. PBJ320 stores each release's designations separately; from the next release on, this page will show which facilities gained or lost the icon and when each risk-based survey first appeared.

Releases on file: September 2026 (1,699 designated)

Sources

Inspection reports

Survey dates and types come from CMS Inspection Dates. PBJ320 does not link individual CMS-2567 inspection reports: it has no source that resolves a specific survey date to its official report, and it will not attach a different inspection's report to a risk-based survey. Each facility's PBJ320 page links to its Care Compare listing.

Questions or corrections: corrections.