Risk-Based Surveys in Georgia

Nursing homes that carry CMS's new High Performing icon, and the inspections CMS has recorded as risk-based surveys: shorter visits CMS says are “only given to higher performing facilities.”

Data: CMS September 2026 · PBJ Q1 2026CMS dataMethodologyCMS policy

Download

25 of 356 Georgia nursing homes (7.0%) carry CMS's High Performing icon in the September 2026 Provider Information release. None has a standard inspection CMS recorded as a risk-based survey (footnote 29). Historical inspection records can predate the September 8, 2026 nationwide rollout.

Nursing homes with CMS High Performing icon status, CMS star ratings and recorded risk-based surveys
CMS star ratings
Ansley Park Health and RehabilitationCCN 115722Newnan, GA★★★★★★★★☆☆★★★★★3.77Aug 14, 2025none in CMS Inspection Dates
Candler Skilled Nursing UnitCCN 115610Savannah, GA★★★★★★★★★★★★★★☆7.95Mar 26, 2026none in CMS Inspection Dates
Friendship Health and RehabCCN 115559Cleveland, GA★★★★★★★★☆☆★★★★★3.55Apr 26, 2026none in CMS Inspection Dates
Gracemore Nursing and RehabCCN 115554Brunswick, GA★★★★★★★★★☆★★★★★3.50Apr 12, 2026none in CMS Inspection Dates
Hart Care CenterCCN 115449Hartwell, GA★★★★★★★★☆☆★★★★★3.77Mar 21, 2025none in CMS Inspection Dates
Joe-Anne Burgin Health and RehabilitationCCN 115272Cuthbert, GA★★★★★★★★★☆★★★★★3.72Mar 19, 2026none in CMS Inspection Dates
LenbrookCCN 115296Atlanta, GA★★★★★★★★★★★★★★☆6.01Feb 26, 2026none in CMS Inspection Dates
Magnolia Place Nursing and RehabilitationCCN 115774Rome, GA★★★★★★★★★★★★★★★6.41Jan 11, 2026none in CMS Inspection Dates
Meadows Park Health and RehabilitationCCN 115726Vidalia, GA★★★★★★★★★☆★★★★☆3.92May 22, 2025none in CMS Inspection Dates
Miona Geriatric & Dementia CenterCCN 115338Ideal, GA★★★★★★★★☆☆★★★★★3.83Apr 27, 2026none in CMS Inspection Dates
Nhc Healthcare Ft OglethorpeCCN 115492Fort Oglethorpe, GA★★★★★★★★☆☆★★★★☆3.31Sep 26, 2025none in CMS Inspection Dates
Pruitthealth - Blue RidgeCCN 115468Blue Ridge, GA★★★★★★★★☆☆★★★★☆3.70Jul 31, 2025none in CMS Inspection Dates
Retreat, TheCCN 115675Monticello, GA★★★★★★★★★☆★★★★★4.18Apr 30, 2026none in CMS Inspection Dates
Ridgecrest Rehab & Skilled Nursing CenterCCN 115478Columbus, GA★★★★★★★★★☆★★★★★4.42Dec 7, 2025none in CMS Inspection Dates
Rockmart HealthCCN 115729Rockmart, GA★★★★★★★★☆☆★★★★★3.66Dec 21, 2025none in CMS Inspection Dates
Ross Memorial Health Care CtrCCN 115515Kennesaw, GA★★★★★★★★☆☆★★★★☆4.14Jul 18, 2025none in CMS Inspection Dates
Salude - the Art of RecoveryCCN 115723Suwanee, GA★★★★★★★★★☆★★★★★4.68Sep 14, 2025none in CMS Inspection Dates
Scott Health & RehabilitationCCN 115671Adrian, GA★★★★★★★★★☆★★★★★3.54Sep 4, 2025none in CMS Inspection Dates
Sparta Health and RehabilitationCCN 115382Sparta, GA★★★★★★★★★☆★★★★★3.62Apr 1, 2026none in CMS Inspection Dates
Stevens Park Health and RehabilitationCCN 115294Augusta, GA★★★★★★★★★★★★★★☆3.81Sep 14, 2025none in CMS Inspection Dates
Terraces at Peachtree Hills Place, TheCCN 115773Atlanta, GA★★★★★★★★★★★★★★☆7.90May 3, 2026none in CMS Inspection Dates
The William Breman Jewish HomeCCN 115022Atlanta, GA★★★★★★★★★☆★★★★★4.71Jun 11, 2026none in CMS Inspection Dates
Twin Oaks Convalescent CenterCCN 115513Alma, GA★★★★★★★★★☆★★★★★3.89Jun 14, 2026none in CMS Inspection Dates
Vista Park Health and RehabilitationCCN 115611Douglas, GA★★★★★★★★★☆★★★★★4.14Sep 11, 2025none in CMS Inspection Dates
Willowbrooke Court at Lanier Village EstatesCCN 115687Gainesville, GA★★★★★★★★★★★★★★★4.24Sep 21, 2025none in CMS Inspection Dates

Star ratings are CMS's (1–5, September 2026 Provider Information): OVR overall, STF staffing, INS health inspection. “Not rated” means CMS published no rating; “fn” is a CMS rating footnote. Risk-based survey: the most recent standard inspection CMS marks with footnote 29. A dash means CMS Inspection Dates has none on record for the facility, not that no inspection took place.

1–25 of 25 facilities

Georgia in context

25High Performing icon
356Nursing homes
7.0%Share (11.6% nationally)
0RBS survey recorded

Methodology & sources

What the High Performing icon is

CMS added a High Performing Icon field (Y/N) to Provider Information in the September 2026 release. CMS's data dictionary describes it as marking homes that exceed the traditional five-star rating, with fewer citations, higher staffing levels and other quality indicators. CMS memo QSO-26-14-NH sets out the criteria for risk-based surveys. CMS's data dictionary does not say the icon is the same thing as eligibility for a risk-based survey, so this page shows the icon and recorded risk-based surveys side by side and does not treat one as proof of the other. The icon is reported exactly as CMS publishes it.

Star ratings and footnotes

Overall, Staffing and Health Inspection ratings are CMS's five-star ratings from the same Provider Information file. Where CMS gives no rating it publishes a footnote code instead, shown here as “fn”. In this release every facility with footnote 18 on its overall rating is a CMS Special Focus Facility, so the table labels those “Not rated: Special Focus Facility”. Other codes are shown as CMS publishes them; see CMS's Provider Information data dictionary for their definitions. In this release every staffing rating that carries footnote 23, 24 or 25 is a 1.

What "risk-based survey" means

CMS marks a standard health inspection with footnote 29 when it was a risk-based survey: “shorter visit with a smaller inspection team.” The column shows the most recent such survey in CMS Inspection Dates. 119 facilities have one on record; 46 of them do not carry the icon in this release. Eligibility and completed inspections are reported separately for that reason.

CMS-recorded risk-based survey dates run from Apr 11, 2024 to Jul 15, 2026; 108 are in 2026. These are historical inspection records, not a count of surveys conducted after nationwide rollout.

CMS revised QSO-26-14-NH (September 29, 2026) confirms that testing began in 2023 in 22 states and more than 100 facilities; nationwide implementation began September 8, 2026. The source fields do not identify pilot participation for individual inspections. PBJ320 preserves CMS footnote 29 and survey dates as published; it does not independently reclassify surveys or label all earlier records as pilot inspections.

What this page does not say

  • A missing icon is not a finding about care. CMS applies criteria that are not all public, and the icon can change month to month.
  • The icon is CMS's designation, not a PBJ320 prediction or rating.
  • A dash in the risk-based survey column means CMS Inspection Dates has no footnote-29 inspection for the facility. It is not evidence that no survey took place.
  • Star ratings and HPRD are context from different sources and periods, listed below.

Dates on this page

CMS processing dateSep 1, 2026The as-of date CMS assigns to the Provider Information file.
CMS last modifiedSep 30, 2026The last-modified date CMS records for the dataset on data.cms.gov.
CMS public releaseOct 8, 2026When CMS released the file publicly on data.cms.gov. CMS announced a delay for this release.
PBJ320 admittedOct 8, 2026When PBJ320 validated and adopted the file.
Survey datesPer facilityActual inspection dates from CMS. A recorded risk-based survey can predate the current icon.
PBJ staffing quarterQ1 2026Total nurse HPRD comes from PBJ payroll data for this quarter, a different period from the CMS ratings.

History

The September 2026 release is the first in which CMS published the High Performing icon and footnote 29. PBJ320 stores each release's designations separately; from the next release on, this page will show which facilities gained or lost the icon and when each risk-based survey first appeared.

Releases on file: September 2026 (1,699 designated)

Sources

Inspection reports

Survey dates and types come from CMS Inspection Dates. PBJ320 does not link individual CMS-2567 inspection reports: it has no source that resolves a specific survey date to its official report, and it will not attach a different inspection's report to a risk-based survey. Each facility's PBJ320 page links to its Care Compare listing.

Questions or corrections: corrections.