Risk-Based Surveys in Illinois

Nursing homes that carry CMS's new High Performing icon, and the inspections CMS has recorded as risk-based surveys: shorter visits CMS says are “only given to higher performing facilities.”

Data: CMS September 2026 · PBJ Q1 2026CMS dataMethodologyCMS policy

Download

43 of 666 Illinois nursing homes (6.5%) carry CMS's High Performing icon in the September 2026 Provider Information release. None has a standard inspection CMS recorded as a risk-based survey (footnote 29). Historical inspection records can predate the September 8, 2026 nationwide rollout.

Nursing homes with CMS High Performing icon status, CMS star ratings and recorded risk-based surveys
CMS star ratings
Alden Estates of EvanstonCCN 145907Evanston, IL★★★★★★★★★☆★★★★★3.58Dec 19, 2025none in CMS Inspection Dates
Alden Estates of ShorewoodCCN 146153Shorewood, IL★★★★★★★★★☆★★★★★4.89Jan 22, 2026none in CMS Inspection Dates
Alden Estates of SkokieCCN 145869Skokie, IL★★★★★★★★★☆★★★★★4.62Sep 18, 2025none in CMS Inspection Dates
Allure of WalnutCCN 146063Walnut, IL★★★★★★★★☆☆★★★★★3.38Apr 24, 2025none in CMS Inspection Dates
Aperion Care Fox RiverCCN 145447Elgin, IL★★★★★★★★☆☆★★★★★3.17Mar 13, 2025none in CMS Inspection Dates
Apostolic Christian HomeCCN 145704Roanoke, IL★★★★★★★★★★★★★★☆3.91Apr 10, 2026none in CMS Inspection Dates
Apostolic Christian Home of EurekaCCN 145673Eureka, IL★★★★★★★★★★★★★★★4.68Mar 25, 2026none in CMS Inspection Dates
Avantara Lake ZurichCCN 145816Lake Zurich, IL★★★★★★★★☆☆★★★★☆3.53May 6, 2026none in CMS Inspection Dates
Avondale Estates of ElginCCN 146181Elgin, IL★★★★★★★★★★★★★★★5.21Jun 27, 2025none in CMS Inspection Dates
Beacon HillCCN 145522Lombard, IL★★★★★★★★★★★★★★☆4.89Jul 3, 2025none in CMS Inspection Dates
Brandel Health and RehabCCN 145527Northbrook, IL★★★★★★★★★★★★★★☆4.19Jul 2, 2026none in CMS Inspection Dates
Central Baptist VillageCCN 145853Norridge, IL★★★★★★★★★★★★★★☆4.56Aug 8, 2025none in CMS Inspection Dates
Citadel Care Center-WilmetteCCN 145932Wilmette, IL★★★★★★★★☆☆★★★★★3.62Apr 9, 2026none in CMS Inspection Dates
Clayberg, TheCCN 146151Cuba, IL★★★★★★★★★☆★★★★★3.87Apr 4, 2025none in CMS Inspection Dates
Clinton Manor Living CenterCCN 146025New Baden, IL★★★★★★★★★★★★★★★7.54Mar 12, 2026none in CMS Inspection Dates
Concordia Village Care CenterCCN 146154Springfield, IL★★★★★★★★★★★★★★☆4.90Jan 8, 2026none in CMS Inspection Dates
Covenant Living - Windsor ParkCCN 145606Carol Stream, IL★★★★★★★★★★★★★★☆3.97Feb 28, 2025none in CMS Inspection Dates
Dupage Care CenterCCN 145050Wheaton, IL★★★★★★★★★☆★★★★☆4.11Sep 11, 2025none in CMS Inspection Dates
Eden Village Care CenterCCN 145384Glen Carbon, IL★★★★★★★★★★★★★★☆4.73Feb 6, 2025none in CMS Inspection Dates
Elms, TheCCN 146033Macomb, IL★★★★★★★★★★★★★★☆4.74Jun 3, 2026none in CMS Inspection Dates
Evenglow LodgeCCN 146095Pontiac, IL★★★★★★★★★☆★★★★★5.08Dec 17, 2025none in CMS Inspection Dates
Gottlieb Memorial HospitalCCN 145526Melrose Park, IL★★★★★★★★★★★★★★★5.56Mar 12, 2026none in CMS Inspection Dates
Greenfields of GenevaCCN 146166Geneva, IL★★★★★★★★★☆★★★★★4.52Dec 23, 2025none in CMS Inspection Dates
H & J Vonderlieth Lvg Ctr, TheCCN 146042Mount Pulaski, IL★★★★★★★★☆☆★★★★★3.45Dec 11, 2025none in CMS Inspection Dates
Hearthwood SNF Senior LivingCCN 146125Bartlett, IL★★★★★★★★★☆★★★★★3.85Nov 26, 2025none in CMS Inspection Dates
Henderson County Ret CenterCCN 146103Stronghurst, IL★★★★★★★★★☆★★★★★3.93Apr 2, 2025none in CMS Inspection Dates
Highland OaksCCN 14A383Elgin, IL★★★★★★★★★★★★★★★5.25Dec 11, 2025none in CMS Inspection Dates
Lincolnwood PlaceCCN 145786Lincolnwood, IL★★★★★★★★★★★★★★☆4.15Nov 21, 2025none in CMS Inspection Dates
Little Sisters of the PoorCCN 146185Chicago, IL★★★★★★★★★★★★★★☆4.30May 7, 2026none in CMS Inspection Dates
Mather Evanston, TheCCN 146145Evanston, IL★★★★★★★★★★★★★★★5.86Mar 20, 2025none in CMS Inspection Dates
Memorial Care CenterCCN 145102Belleville, IL★★★★★★★★★☆★★★★★5.31Mar 5, 2026none in CMS Inspection Dates
Mercy CircleCCN 146174Chicago, IL★★★★★★★★★★★★★★☆4.35Apr 30, 2026none in CMS Inspection Dates
Mercy Harvard Hospital Care CenterCCN 146014Harvard, IL★★★★★★★★★★★★★★★6.76Feb 18, 2026none in CMS Inspection Dates
Meridian Village Care CenterCCN 146142Glen Carbon, IL★★★★★★★★★★★★★★★4.66Mar 26, 2026none in CMS Inspection Dates
Oak TraceCCN 145804Downers Grove, IL★★★★★★★★★★★★★★☆4.30Mar 20, 2026none in CMS Inspection Dates
Park Place Christian CommunityCCN 146155Elmhurst, IL★★★★★★★★★★★★★★☆4.67Apr 25, 2025none in CMS Inspection Dates
Pearl of Crystal Lake, TheCCN 145612Crystal Lake, IL★★★★★★★★★☆★★★★☆3.79Jun 4, 2026none in CMS Inspection Dates
Plymouth PlaceCCN 146128La Grange Park, IL★★★★★★★★★☆★★★★★4.56Feb 26, 2026none in CMS Inspection Dates
Snyder VillageCCN 145596Metamora, IL★★★★★★★★★★★★★★☆4.91Apr 30, 2026none in CMS Inspection Dates
Terraces at the ClareCCN 146141Chicago, IL★★★★★★★★★★★★★★☆4.96May 2, 2025none in CMS Inspection Dates
Vi at the GlenCCN 146107Glenview, IL★★★★★★★★★★★★★★★4.54Jun 26, 2025none in CMS Inspection Dates
Wesley VillageCCN 146047Macomb, IL★★★★★★★★★★★★★★★4.87Dec 4, 2025none in CMS Inspection Dates
Wynscape Health & RehabCCN 145213Wheaton, IL★★★★★★★★★☆★★★★★4.24Aug 22, 2025none in CMS Inspection Dates

Star ratings are CMS's (1–5, September 2026 Provider Information): OVR overall, STF staffing, INS health inspection. “Not rated” means CMS published no rating; “fn” is a CMS rating footnote. Risk-based survey: the most recent standard inspection CMS marks with footnote 29. A dash means CMS Inspection Dates has none on record for the facility, not that no inspection took place.

1–25 of 43 facilities

Illinois in context

43High Performing icon
666Nursing homes
6.5%Share (11.6% nationally)
0RBS survey recorded

Methodology & sources

What the High Performing icon is

CMS added a High Performing Icon field (Y/N) to Provider Information in the September 2026 release. CMS's data dictionary describes it as marking homes that exceed the traditional five-star rating, with fewer citations, higher staffing levels and other quality indicators. CMS memo QSO-26-14-NH sets out the criteria for risk-based surveys. CMS's data dictionary does not say the icon is the same thing as eligibility for a risk-based survey, so this page shows the icon and recorded risk-based surveys side by side and does not treat one as proof of the other. The icon is reported exactly as CMS publishes it.

Star ratings and footnotes

Overall, Staffing and Health Inspection ratings are CMS's five-star ratings from the same Provider Information file. Where CMS gives no rating it publishes a footnote code instead, shown here as “fn”. In this release every facility with footnote 18 on its overall rating is a CMS Special Focus Facility, so the table labels those “Not rated: Special Focus Facility”. Other codes are shown as CMS publishes them; see CMS's Provider Information data dictionary for their definitions. In this release every staffing rating that carries footnote 23, 24 or 25 is a 1.

What "risk-based survey" means

CMS marks a standard health inspection with footnote 29 when it was a risk-based survey: “shorter visit with a smaller inspection team.” The column shows the most recent such survey in CMS Inspection Dates. 119 facilities have one on record; 46 of them do not carry the icon in this release. Eligibility and completed inspections are reported separately for that reason.

CMS-recorded risk-based survey dates run from Apr 11, 2024 to Jul 15, 2026; 108 are in 2026. These are historical inspection records, not a count of surveys conducted after nationwide rollout.

CMS revised QSO-26-14-NH (September 29, 2026) confirms that testing began in 2023 in 22 states and more than 100 facilities; nationwide implementation began September 8, 2026. The source fields do not identify pilot participation for individual inspections. PBJ320 preserves CMS footnote 29 and survey dates as published; it does not independently reclassify surveys or label all earlier records as pilot inspections.

What this page does not say

  • A missing icon is not a finding about care. CMS applies criteria that are not all public, and the icon can change month to month.
  • The icon is CMS's designation, not a PBJ320 prediction or rating.
  • A dash in the risk-based survey column means CMS Inspection Dates has no footnote-29 inspection for the facility. It is not evidence that no survey took place.
  • Star ratings and HPRD are context from different sources and periods, listed below.

Dates on this page

CMS processing dateSep 1, 2026The as-of date CMS assigns to the Provider Information file.
CMS last modifiedSep 30, 2026The last-modified date CMS records for the dataset on data.cms.gov.
CMS public releaseOct 8, 2026When CMS released the file publicly on data.cms.gov. CMS announced a delay for this release.
PBJ320 admittedOct 8, 2026When PBJ320 validated and adopted the file.
Survey datesPer facilityActual inspection dates from CMS. A recorded risk-based survey can predate the current icon.
PBJ staffing quarterQ1 2026Total nurse HPRD comes from PBJ payroll data for this quarter, a different period from the CMS ratings.

History

The September 2026 release is the first in which CMS published the High Performing icon and footnote 29. PBJ320 stores each release's designations separately; from the next release on, this page will show which facilities gained or lost the icon and when each risk-based survey first appeared.

Releases on file: September 2026 (1,699 designated)

Sources

Inspection reports

Survey dates and types come from CMS Inspection Dates. PBJ320 does not link individual CMS-2567 inspection reports: it has no source that resolves a specific survey date to its official report, and it will not attach a different inspection's report to a risk-based survey. Each facility's PBJ320 page links to its Care Compare listing.

Questions or corrections: corrections.